Orion’s approach to design-build is to maximize integration between clients, consultants, and staff. Orion’s core management, design consultants, and key subcontractors have remained consistent for over a decade, ensuring a high degree of familiarity and trust among the partners. The integrated construction approach streamlines the design and construction, ensuring the project is delivered in the most cost and time effective manner.

Recently completed design-build projects include:

Demolish Sewer Treatment Plants 10, 11, 12 (Camp Pendleton, CA)

P-1044  Advanced Water Treatment Plant/Conveyance Pipelines (Camp Pendleton, CA)

Install Emergency Generators and Unity Connections for Multiple Sewer Lift Stations (Camp Pendleton, CA)

Design-Build Scripps Ranch Pump Station (Scripps Ranch, CA)

Mission Gorge Road Emergency Repair (San Diego, CA)

Buena Vista Creek Restoration (Vista, CA)

Repair Sewer Mains, Marine Corps Logistics Base (Barstow, CA)

Asbestos Cement Water Group 1010 & 1005 (San Diego, CA)

Storm Water Permanent BMP Retrofit (San Diego, CA)