Design-Build Water Group Job 926 – San Diego, CA

This design-build project included the replacement of nearly 2.5 miles of potable water main and appurtenances in Point Loma, CA. Orion worked with the City of San Diego to determine early on where trenchless (CIPP) methods could be used to rehabilitate existing water main. This substantially reduced the construction impact in the neighborhoods. The balance of the water main was replaced by traditional open-but methods. 

Share Our Work