This design-build project required the design and reconstruction of restroom facilities in Building 3, an administration building at MCRD.  Orion removed and replaced toilets, sinks, and behind-the-wall plumbing. The walls within the remodeled restrooms were furred out to install new fixtures meeting plumbing code.

To ensure critical command command functions could continue, the building remained in operation during construction. Orion sequenced its work and  coordinated with building staff to ensure they could continue working.