Design Build Advanced Water Treatment Plant – Camp Pendleton, CA

By: Orion Categories: Treatment Plants

Orion built a water treatment plant and designed and built all conveyances in Camp Pendleton. CH2M Hill designed the treatment plant with Orion as a primary subcontractor constructing it. Orion designed and built the treatment plant’s conveyance system. This highly complex project required a multidisciplinary team to construct an operations building with chemical laboratory, two one-million-gallon bolted steel tanks, an underground sewer lift station, a chemical storage facility, a pump station, and to install over 90,000 LF of HDPE pipe, requiring directional drilling under multiple rivers and a freeway.