AC Water and Sewer Group Job 1024

In February 2018, the City of San Diego awarded the design-build AC Water and Sewer Group 1024 to Orion. The project involves installation of over 16,000 linear feet of new sewer and water pipeline in several locations in San Diego.

Carlsbad Drainage Master Plan

In January 2018, the City of Carlsbad awarded Orion a project to construct and rehabilitate storm drain systems within the City. The project is part of the City’s drainage master plan.

Helix Pipeline 4459

In January 2018, The Helix Water District recently awarded Construction Project “Pipeline 4459” to Orion. The project includes replacement of over 13,000 linear feet of pipeline in the Helix Water District jurisdiction.

Camp Pendleton Reservoir Repair

In January 2017, NAVFAC Southwest awarded Orion a project to repair a potable water reservoir in Camp Pendleton, CA.  The project involves replacement of a 102′ reservoir roof with a new aluminum roof and a new interior liner.